Skip to content

The Glane culvert

Through the ages

  • Sources
    • Münster Waterways and Shipping Authority
      • (1292) Damage to and repairs of the Glane culvert
        • Damage to and repairs of the Glane culvert beneath the second branch of the Dortmund-Ems Canal near Ladbergen between 1944 and 1947
      • (1299) Construction of the Glane Culvert II
      • (1300) Master record for the construction of the new Glane culvert
        • Damage to the Dortmund-Ems Canal during the bombing raids from September 23, 1944 to March 3, 1945 on the 2nd Glane trip
        • Letter from Gustav Fiegenbaum to the Rheine Waterways Authority, 22 August 1945
      • (1325) Glane culvert
        • Report on the condition of the Glane culvert at km 0.910 of the second branch of the Dortmund-Ems Canal near Ladbergen and an assessment of the need to construct a new culvert
      • (1326) Winding-up of the new Glane culvert
        • Letter to Polensky & Zöllner, 24 November 1947
        • Letter to Polensky & Zöllner, 10 December 1947
  • English
    • Deutsch
    • English

(1326) Winding-up of the new Glane culvert

  • Reference number: O 103 / Wasser- und Schifffahrtsämter / Wasser- und Schifffahrtsamt Münster, Nr. 1326
  • Duration: 1947-1948
  • Provenance: Defunct
  • Documents:
  • Letter to Polensky & Zöllner, 24 November 1947
  • Letter to Polensky & Zöllner, 10 December 1947

© 2026 Rainer Hillebrand

  • Imprint
  • Privacy Policy
  • Copyright
  • Last modified: 28 April 2026, 2:57 pm
  • Imprint
  • Privacy Policy
  • Copyright
  • Last modified: 28 April 2026, 2:57 pm
Home » Sources » Münster Waterways and Shipping Authority » (1326) Winding-up of the new Glane culvert